Online Building Departments
Select...
Lake Sumter State College
Oakland
Seminole State College
Valencia College
Windermere
About
Services
News
Contact
Online Building Departments
Select...
Lake Sumter State College
Oakland
Seminole State College
Valencia College
Windermere
Online Building Departments
Valencia College
Apply For Permits
Inspection Request
View Permits
Inspection Request
Inspections requests must be received by 4:00pm on a business day in order to be conducted on the next business day. The inspector will attempt to meet your requested inspection time.
Date of Request: *
Permit Number: *
Project Contractor/Owner-Builder: *
Project Address:
(Please include Lot#, if applicable)
*
Inspection Date: *
Requested By: *
Requestor's Phone#: *
Requestor's Email: *
Select an inspection type below
Building/Structural
* Select all that apply *
Footing/Foundation
Stem Wall
Slab/Monolithic
Masonry
Wall/Ceiling
Framing
Insulation
Structural
Sheetrock
Roof in Progress
Roof Final
Building Final
Ready for CO/CC
Other:
Electrical
* Select all that apply *
Underground
Floor Rough-in
Wall Rough-in
Ceiling Rough-in
Panel/Feeder
Service/Ground
Appliance/Equipment
Lightning Protection
Electrical Final
Ready for CO/CC
Other:
Plumbing
* Select all that apply *
Underground
Rough-in
Stack Piping/Test
Water Piping/Test
Gas Piping/Test
Storm Piping/Test
Fixtures
Equipment
Plumbing Final
Ready for CO/CC
Other:
Mechanical
* Select all that apply *
Duct Rough-in
Steam Piping/Test
HW Piping/Test
CHW Piping/Test
Cond. Piping/Test
Insulation
Wall/Ceiling
Equipment
Mechanical Final
Ready for CO/CC
Other:
Residential Pool
* Select all that apply *
Steele and Ground
Open Trench - Plumbing and Electrical - Pressure
Deck and Bond (EPQ)
Safety (Can be combined with Final)
Final All Trades
Ready for CO/CC
Other:
Fire
* Select all that apply *
Fire Underground
Visual
Hydro
Flush
Backflow Preventer
Forward Flow
Hydrant Flow Test
Final
Fire Sprinkler
Overhead Visual
Overhead Hydro
24-hr. Pneumatic Start
24-hr. Pneumatic End
Final
Fire Standpipe
Overhead Visual
Hydro
24-hr. Pneumatic Start
24-hr. Pneumatic End
Operating Test
Final
Fire Pump
Final
Fire Suppression
System Final
Fire Alarm
Rough
Final
Ready for CO/CC
Other: