Online Building Departments
Online Building Departments

Online Building Departments

Seminole State College

Follow These Permitting Portal Instructions

PDCS, LLC is pleased to partner with Seminole State College to provide building department services to help sustain and develop a safe environment on all of the SSC campuses.

Permit Application Instructions:

To apply for a permit please review the submittal guideline; located in the right hand column. This guideline provides you with a detailed checklist of required documents and submission materials for a permit.

The permit application for Seminole State College can be found by simply selecting “Apply for Permit” at the top of this page. The permit application is a PDF which you may type directly on if you wish, you will then need to print and sign in the presence of a notary before submitting your application to PDCS for permitting.

 

Submitting your application & documents for permitting:

After you have printed and completed the application and compiled all of your documents (license, insurance, etc.) for submittal you may scan them into an electronic file (pdf). With this pdf you may upload them in the area titled “Upload Completed Application” on the right hand side of this page. ****Please DO NOT upload electronic versions of plans.****

If you have any questions, comments, or concerns please contact the PDCS Permitting Department at 407-277-9795 or via email at permit@pdcsllc.com. If you choose to contact PDCS via email please include the project name and campus location in your email.

 

IMPORTANT NOTE:

*Contractor(s)/Subcontractor(s) are required to provide copies of current state licenses and copies of certificates of insurance indicating general liability insurance and workers compensation (or a copy of your exemption) with every permit application.

 

Inspection Request Notice:

To request an inspection, complete the “Inspection Request Form” located at the top of the page. Inspections are conducted the next business day and are completed closest to requested time as possible. The inspection request cut off time is 4:00pm for next business day inspections.

Examples:

You request inspection at 2:00pm on Monday then you receive the inspection on Tuesday.

You request inspection at 4:05pm on Wednesday then you will receive the inspection on Friday.